    <title>Prop H and Prop U: Performance Measures</title>
    <link>http://proph.build-guhsd.com/Lists/Performance Measures/campus.aspx</link>
    <description>RSS feed for the Performance Measures list.</description>
    <lastBuildDate>Fri, 10 Sep 2010 00:21:52 GMT</lastBuildDate>
    <generator>Windows SharePoint Services V3 RSS Generator</generator>
    <ttl>60</ttl>
    <image>
      <title>Prop H and Prop U: Performance Measures</title>
      <url>/_layouts/images/homepage.gif</url>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/campus.aspx</link>
    </image>
    <item>
      <title>Building Improvement</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=69</link>
      <description><![CDATA[<div><b>Phase Type:</b> 2B Modernization</div>
<div><b>Campus:</b> 42 - Viking Center</div>
<div><b>Phase Status:</b> Design</div>
<div><b>Percent Complete:</b> 80 %</div>
<div><b>Scope of Project:</b> Replacement of existing facility with new building approved by the Governing Board in February.</div>
<div><b>Budget:</b> Going Well</div>
<div><b>Schedule:</b> Going Well</div>
<div><b>Architect:</b> Platt Whitelaw</div>
<div><b>Project Manager:</b> <div></div></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:35:18 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=69</guid>
    </item>
    <item>
      <title>ADA Site Improvements</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=71</link>
      <description><![CDATA[<div><b>Phase Type:</b> 2B Modernization</div>
<div><b>Campus:</b> 40 - Chaparral</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> Site ADA compliance including restroom access, remodel, path of travel. Repair and renovate existing deteriorated academic classrooms.</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Project Manager:</b> <div></div></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:42:23 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=71</guid>
    </item>
    <item>
      <title>300 Floor Remodel</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=70</link>
      <description><![CDATA[<div><b>Phase Type:</b> 2B Modernization</div>
<div><b>Campus:</b> 09 - Valhalla</div>
<div><b>Phase Status:</b> Construction</div>
<div><b>Percent Complete:</b> 0 %</div>
<div><b>Scope of Project:</b> Modernization of 8 classrooms, consistent with the Disrict Standards and performance capablities within each classroom (New roof systems, HVAC, data power &amp; power) and perform all required underground infrastructure (electrical, gas, water, sanitary sewer, drainage, communications, fire alarm and data) work. Abate all hazardous materials within the classroom buildings; address the removal of barriers consistent with the ADA transition plan.</div>
<div><b>Budget:</b> Going Well</div>
<div><b>Schedule:</b> Going Well</div>
<div><b>Architect:</b> Platt Whitelaw</div>
<div><b>Construction Manager:</b> C.W. Driver</div>
<div><b>Project Manager:</b> <div>Janea Quirk</div></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Valhalla/Schedules/VHHS%202B.pdf">Summary Project Schedule</a></div>
<div><b>Construction Report:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Valhalla/Construction%20Reports/VHS%20-%20Weekly%20Report%20-%20081608.pdf">Weekly Construction Progress Report</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:36:53 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=70</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=78</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 09 - Valhalla</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> Two-story 12 classroom science building. The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural). The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> Platt Whitelaw</div>
<div><b>Project Manager:</b> <div>Janea Quirk</div></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Valhalla/Schedules/VHHS%203A%20Schedule.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 22:49:01 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=78</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=77</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 08 - Santana</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a one-story (14,033 GSF) science classroom building.  The program consists of ten (10) classrooms (2 Chemistry; 5 Biology; 1 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation work consists of the demolition of 14 attached portables and hardscape; relocation of guidance office. The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan.</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> Harley Ellis Devereaux</div>
<div><b>Project Manager:</b> <div>Janea Quirk</div></div>
<div><b>Project Image:</b> <a href="http://proph.build-guhsd.com/Site%20Images/Forms/AllItems.aspx?View={197636D2-81FE-4838-BEB0-97E5ADB4B7E9}&amp;RootFolder=%2FSite%20Images%2FGrossmont&amp;View={197636D2-81FE-4838-BEB0-97E5ADB4B7E9}">Image Library</a></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Santana/Schedules/SHS%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 18:01:52 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=77</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=76</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 07 - Monte Vista</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a one-story (14,033 GSF) science classroom building.  The program consists of ten (10) classrooms (2 Chemistry; 5 Biology; 1 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation work consists of the removal of 5 relocatables, and 2 trailers; relocate the existing &quot;live on&quot; trailer; relocate 2 portable classrooms. The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan.</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> Harley Ellis Devereaux</div>
<div><b>Project Manager:</b> <div>Scott Wilkins</div></div>
<div><b>Multi-Prime Contractors:</b> C.W. Driver</div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Monte%20Vista/Schedules/MVHS%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:57:41 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=76</guid>
    </item>
    <item>
      <title>Science Building </title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=75</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 06 - Granite Hills</div>
<div><b>Phase Status:</b> Construction</div>
<div><b>Percent Complete:</b> 65 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a one-story (14,033 GSF) science classroom building.  The program consists of ten (8) classrooms (2 Chemistry; 4 Biology; 2 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation work consists of the relocation of one classroom; add 3 relocatable classrooms; demolition of 2 buildings, slabs &amp; foundations.  The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Going Well</div>
<div><b>Schedule:</b> Going Well</div>
<div><b>Architect:</b> HMC</div>
<div><b>Project Manager:</b> <div>Dena Johnson</div></div>
<div><b>Multi-Prime Contractors:</b> Jaynes</div>
<div><b>Design Report:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Granite%20Hills/Phase%203A%20Schematic%20Design/Schematic%20Design.PDF">Schematic Design</a></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Granite%20Hills/Schedules/GHHS%203A.pdf">Summary Project Schedule</a></div>
<div><b>Construction Report:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Granite%20Hills/Construction%20Reports/GHHS%20Science%2010-10-08%20PDF.pdf">Weekly Construction Progress Report</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:55:07 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=75</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=74</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 05 - El Capitan</div>
<div><b>Phase Status:</b> Construction</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a one-story (14,033 GSF) science classroom building.  The program consists of ten (10) classrooms (6 Chemistry; 2 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation includes the relocation of one relocatable classroom, demolition of seven (7) relocatable classrooms, demolish asphalt.  The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> Harley Ellis Devereaux</div>
<div><b>Project Manager:</b> <div>Dena Johnson</div></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/El%20Capitan/Schedules/ECHS%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:52:33 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=74</guid>
    </item>
    <item>
      <title>Building 700E</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=38</link>
      <description><![CDATA[<div><b>Phase Type:</b> 2B Modernization</div>
<div><b>Campus:</b> 04 - Mount Miguel</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> Modernization of 13 standard classrooms &amp; restroom facilities, consistent with the District Standards and performance capablities within each classroom (New roof systems, HVAC, data power &amp; power) and perform all required underground infrastructure (electrical, gas, water, sanitary sewer, drainage, communications, fire alarm and data) work. Abate all hazardous materials within the classroom buildings; address the removal of barriers consistent with the ADA transition plan.</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> Mele Amantea</div>
<div><b>Construction Manager:</b> C.W. Driver</div>
<div><b>Project Manager:</b> <div>Janea Quirk</div></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Mount%20Miguel/Schedules/MMHS%202B.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 16:24:40 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=38</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=73</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 03 - El Cajon Valley</div>
<div><b>Phase Status:</b> Complete</div>
<div><b>Percent Complete:</b> 100 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a one-story (14,033 GSF) science classroom building.  The program consists of ten (10) classrooms (2 Chemistry; 4 Biology; 2 Physics).  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation includes relocating tenants from existing office space; demolish signle structure; remove 3 mature trees.  The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Project Complete</div>
<div><b>Schedule:</b> Project Complete</div>
<div><b>Architect:</b> HMC</div>
<div><b>Construction Manager:</b> Erickson Hall</div>
<div><b>Project Manager:</b> <div>Scott Wilkins</div></div>
<div><b>Multi-Prime Contractors:</b> Soltek Pacific</div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/El%20Cajon%20Valley/Schedules/ECVHS%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>Debbie Murray</author>
      <pubDate>Sat, 15 Mar 2008 17:49:47 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=73</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=13</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 02 - Helix Charter</div>
<div><b>Phase Status:</b> Construction</div>
<div><b>Percent Complete:</b> 99 %</div>
<div><b>Scope of Project:</b> The scope of the New Science Building Project (3A) encompasses designing a two-story (17,033 GSF) science classroom building.  The program consists of ten (10) classrooms (4 Chemistry; 4 Biology; 2 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Site Preparation includes the demolition and removal of four (4) relocatable classroom buildings.  The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Going Well</div>
<div><b>Schedule:</b> Concern</div>
<div><b>Architect:</b> Harley Ellis Devereaux</div>
<div><b>Construction Manager:</b> Turner</div>
<div><b>Project Manager:</b> <div>Debbie Murray</div></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Helix/Schedules/HCHS%20-%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>System Account</author>
      <pubDate>Fri, 07 Mar 2008 00:51:54 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=13</guid>
    </item>
    <item>
      <title>Science Building</title>
      <link>http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=5</link>
      <description><![CDATA[<div><b>Phase Type:</b> 3A New Building</div>
<div><b>Campus:</b> 01 - Grossmont</div>
<div><b>Phase Status:</b> Construction</div>
<div><b>Percent Complete:</b> 99 %</div>
<div><b>Scope of Project:</b> The scope of the Science Building Project (3A) encompasses designing a two-story science classroom building on the site of the current boy&#39;s locker room, shower facilities and weight room.  The design is approximately 17,033 GSF for the Science Building comprising ten (10) classrooms (3 Chemistry; 5 Biology; 2 Physics) and New Restrooms.  The building will be designed to the current District Standards as to performance capabilities, and per Education Code and building codes (ADA compliance, Fire Life Safety, Structural).  Separately, construct a new 9,250 GSF Boys Locker, Showers, Weight Room. The underground utility infrastructure (wet &amp; dry) utilities will removed, rerouted, installed (as required or requested) consistent with the underground utilities infrastructure plan</div>
<div><b>Budget:</b> Going Well</div>
<div><b>Schedule:</b> Going Well</div>
<div><b>Architect:</b> Harley Ellis Devereaux</div>
<div><b>Construction Manager:</b> Turner</div>
<div><b>Project Manager:</b> <div>Debbie Murray</div></div>
<div><b>Multi-Prime Contractors:</b> Jaynes</div>
<div><b>Design Report:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Grossmont/Schmatic%20Design%203A/Locker%20Facility-Science%20Building.pdf">Schematic Design</a></div>
<div><b>Project Schedule:</b> <a href="http://proph.build-guhsd.com/Campus%20Content/Grossmont/Schedules/GMHS%20-%203A.pdf">Summary Project Schedule</a></div>
<div><b>Prop:</b> Prop H</div>
]]></description>
      <author>System Account</author>
      <pubDate>Thu, 06 Mar 2008 20:46:40 GMT</pubDate>
      <guid isPermaLink="true">http://proph.build-guhsd.com/Lists/Performance Measures/DispForm.aspx?ID=5</guid>
    </item>